一、安装方法
1、 Installation method
1、根据所需的水平高度,垂直和垂直绘制水平线;
1. Draw horizontal lines vertically and vertically according to the required horizontal height;
2、根据起吊轻钢龙骨的适当间距(38或50),一般间距为1-1.2米,根据轻钢龙骨吊杆的距离分布;
2、 According to the appropriate spacing (38 or 50) of lifting light steel keel, the general spacing is 1-1.2 meters, according to the distance distribution of light steel keel suspenders;
3、安装时必须带上手套,如不小心留下指纹或污渍,可用洗涤液用水擦干;
3. Gloves must be worn during installation. If fingerprints or stains are left carelessly, they can be dried with washing solution and water;
4、预先安装在龙骨吊件上,即使是同方通过龙骨安装在轻钢龙骨下面,方龙骨间距一般为1米,均须在装载后调整到水平面;
4, pre installed on the keel suspension, even if the same side is installed under the light steel keel under the same side through the keel, the square keel spacing is generally 1 meters, all must be adjusted to the horizontal plane after loading.
5、铝单板/木纹铝单板/铝单板吊顶系列为了扣住并挂在龙骨上,再按下反向锁板,方端应保持0mm或20mm的距离。
5、 Aluminum veneer / wood grain aluminum veneer / aluminum veneer ceiling series in order to buckle and hang on the keel, and then press the reverse lock plate, the square end shall be kept at a distance of 0mm or 20mm.
二、铝单板安装主要注意事项:
2、 Main precautions for installation of aluminum veneer:
1.搬运和搬运过程中应轻放轻放。铝单板在受到严重冲击后,其边角和布局都会受到破坏,影响施工,浪费资金。
1. Handle with care during handling. After the aluminum veneer is seriously impacted, its corners and layout will be damaged, which will affect the construction and waste funds.
2.在安装铝单板时,也要注意保护板材表面,不要用板材表面接触地面,以免划伤装饰表面。
2. When installing the aluminum veneer, also pay attention to protect the surface of the plate. Do not touch the ground with the plate surface to avoid scratching the decorative surface.
3.铝单板的品种、质量、颜色、图案、线条等应符合设计要求,并具有产品合格证。
3. The variety, quality, color, pattern, line, etc. of aluminum veneer shall meet the design requirements and have the product certificate.
4.采用钢龙骨的幕墙框架,其规格及外形应符合设计要求,并进行除锈防锈处理。
4. For the curtain wall frame with steel keel, its specification and appearance shall meet the design requirements, and the rust removal and anti rust treatment shall be carried out.
5.铝饰面安装时,当设计没有特殊要求时,尽量采用抽芯铝铆钉,中间必须填充橡胶圈。抽芯铆钉间距控制在100-150mm内。
5. During the installation of aluminum facing, when there is no special requirement in the design, pop rivets shall be used as far as possible, and rubber rings shall be filled in the middle. The spacing of pop rivets shall be controlled within 100-150 mm.
6.铝单板安装完成后,务必在3天后撕掉保护膜。如果时间太长,很难撕下,撕下后会影响外观。
6. After the installation of the aluminum veneer, the protective film must be removed after 3 days. If the time is too long, it is difficult to tear it off, which will affect the appearance.